Showing posts with label Engineering. Show all posts
Showing posts with label Engineering. Show all posts

How Many Wreckers Does It Take To Get One Motor Home Unstuck?

During SpeedWeek in 2007 a motor home got stuck in the salt. A small yellow wrecker came for a rescue and also got stuck. Next, a large yellow wrecker tried to pull them out and also got stuck. Then a large blue wrecker came to help but also got stuck. One motor home and three wreckers had to spent night stuck in the salt until they were rescued the next morning.


Sexy Girl Bikini PC Case Mod

The computer case in these photos is rather unique. It has been modified to the extent that I couldn’t even tell that it was a computer case at first… So if you have a need to disguise your computer case, try using a girl in a bikini. :)


Recycled Home

Some people take recycling to the extreme. The home in these photos was made entirely out of recycled shipping containers. I don’t know if it was any less expensive than a normal, but it certainly is unique and I suppose it does help the environment.


Animatronic Dinosaurs Invade London

A Dinosaur Unleashed is an animatronics dinosaur display that today opens its gates to the public. It is located on Oxford Street, a well-known shopping area of London turned dinosaur playground. 24 life-like dinosaur models (including stegosaurus, iguanadon, diplodocus or tyrannosaurus rex) will entertain visitors with their realistic movements and sounds. The largest dinosaur model on display is the 30-meters-tall Diplodocus, 3 times the length of an English double-decker bus
Just as impressive as the robotic dinosaurs is the incredible setting. Featuring marshland, forest and prehistoric plants that existed during the reign of the dinosaurs, it will take people 65 million years into the past.


An Architect Try to Make a Different Design of House

It's Montreal, Quebec, Canada.



The Highest Railway Track in the World

This is one of the highest railways track in the world. It connects Xining, Qinghai Province, to Lhasa, Tibet Autonomous Region, in China. The total length of Qingzang railway is 1956 km. Construction of the 815 km section between Xining and Golmud was completed by 1984. This railway is the first to connect China proper with the Tibet Autonomous Region, which, due to its altitude and terrain, is the last province-level entity in mainland China to have a conventional railway. More than 960 km, or over 80% of the Golmud-Lhasa section, is at an altitude of more than 4,000 m. The 1,142-km Qinghai–Tibet railway from Golmud to Lhasa was completed on 12 October 2005. It opened to regular trial service on 1 July 2006. The trains are specially built for high altitude environment. From October 2006 five pairs of passenger trains run between Golmud and Lhasa, and one more pair between Xining and Golmud. The line has a capacity of eight pairs of passenger trains, and the carriages are specially built and have an oxygen supply for each passenger.


Military Camouflage of Supercars


Amazing Freeway Interchanges